Blog Archives

The prestigious new home for the School of Law and a new social hub is a key element in the major investment of £350m in world-class facilities for staff and students planned over the next decade at Queen’s University, Belfast. … More >>

St Clare’s School in Derby required a roof refurbishment to tackle the existing problems with their current roofing system. The existing roof showed signs of general aging and did not include thermal insulation, also the out-dated fragile rooflights needed upgrading. … More >>

River Clyde Homes is the first organisation to procure through SPA’s new Flat Roofing framework. The Housing Association awarded the £1,000,000 project to manufacturers Alumasc Roofing Systems and Graham Roofing (Scotland) who will install the new Caltech Liquid Roofing System. … More >>

Cambridge Assessment, the university’s international exams group, will be moving to a new home in 2018. The Triangle, the new international headquarters will bring together all Cambridge Assessment’s Cambridge-based staff, currently based in 11 different offices across the city, bringing … More >>

The latest St James Homes project Kew Bridge is a celebration of all that makes riverside living rewarding. Close to the heart of fashionable, historic Kew, it combines an idyllic location with stunning architecture and a wealth of facilities.   … More >>

Filed under:
Blackdown,
Blue Roofs,
Derbigum,
Green Roofs,
Roofing,
Stormwater Management,
Uncategorised,
Uncategorized,
Waterproofing,
Comments Off on Kew Bridge Phase 2, West London provided with a mixture of Alumasc Green and Blue Roof solutions
Article Tags:
,
,
,
,
,
,
,

Alumasc are pleased to announce that Rob Smith has been promoted to the position of Refurbishment Director and, as such, will become a member of the Alumasc Roofing Systems Senior Management Board. Due to Rob’s experience and demonstrated success in … More >>

Filed under:
Blackdown,
Blue Roofs,
Derbigum,
The Team,
Uncategorised,
Uncategorized,
Waterproofing,
Comments Off on London Area Manager Rob Smith promoted to Refurbishment Director
Article Tags:
,
,
,

Alumasc is committed to improving their internal and external operation and have adopted a new scheme – ‘investment in the future’.   Sam Clayden – South West Assistant Technical Manager Sam is new to the roofing industry and will be … More >>

Due to the rapid growth within Alumasc Roofing Systems, Alumasc are pleased to announce the appointment of Jonathan Price to the role of National Business Development Director. Jonathan will be working alongside the Area Managers all over the UK outlining … More >>

Filed under:
Blackdown,
Blue Roofs,
Derbigum,
Eco Roofs,
Green Roofs,
Guardrail,
Hot Melt,
Hydrotech,
Liquid Roofing,
Refurbishment,
Roofing,
Stormwater Management,
Uncategorised,
Uncategorized,
Waterproofing,
Comments Off on New National Business Development Director joins Alumasc Roofing’s growing team
Article Tags:
,
,
,
,

BluRoof is a roof designed to alleviate flood risk by reducing and controlling the peak rate of discharge in compliance with design requirements; facilitating the detention of stormwater, up to a prescribed maximum hydraulic head, for subsequent discharge over an elongated period … More >>

Alumasc’s Derbigum Flat Roofing System has been used at Hampton Court and Richmond Court – two historic five-storey apartment blocks, which have undergone a £2.9m refurbishment for Birmingham City Council as part of the Constructing West Midlands framework. Derbigum was … More >>

Filed under:
Derbigum,
Eco Roofs,
Guardrail,
Refurbishment,
Uncategorised,
Uncategorized,
Waterproofing,
Comments Off on Derbigum Flat Roofing Solution for Hampton Court and Richmond Court
Article Tags:
,
,
,
,
Subscribe to our RSS feed

Search Blog

White House Works, Bold Road, Sutton, St Helens, Merseyside, WA9 4JG