What happens if a Blue Roof becomes blocked?
Blue Roof maintenance requirements are stipulated to prevent the occurrence of a blockage. Each roof is designed to ensure that no overflow occurs for the prescribed design storm event. However, as a further precautionary measure, one Harmer weir overflow outlet is typically specified for each Harmer BluRoof outlet.
In the event of a storm that exceeds the design storm parameters, the overflow outlets will discharge stormwater in the same manner as a conventional flat roof (i.e. instantaneously). As such, overflows are designed to discharge stormwater that exceeds the Blue Roof storage capacity in accordance with BS EN 12056-3:2000.
How does a Blue Roof impact on the structural capacity of the roof structure it is installed on?
The loads imposed by a blue roof will be checked against the capacity of the roof’s structure by the appointed structural engineer on a project by project basis in accordance with the calculated volume of water attenuated.
How long does the water take to drain from the Blue Roof?
This will be determined by the number of Blue Roof outlets specified, and any key design targets that have been stipulated, i.e. volume of water attenuated, or % reduction in the peak run-off rate.
Taking those targets into account, the roof area will however by designed so that the system entirely discharges of water within 48 hours, in accordance with good SuDS practice.
Can a roof be installed to zero falls?
Installing a roof at zero falls, a key design factor that allows cost and weight savings to be made by omitting the need for a screed to falls, is achievable when specifying Hydrotech 6125 Structural Waterproofing. The monolithic nature and high bond strength of the Hydrotech waterproofing allows for the system to be installed in this manner, which is reinforced by third party accreditation in the Hydrotech BBA certificate 90-2431.
This advantage, coupled with the unrivalled track record of no product failures in over 50 years of installation, makes Hydrotech 6125 the optimum choice for large roof areas, podiums and courtyards, particularly in buried, hard and soft landscaped build-ups.
If you would like to find out more about our BluRoof Stormwater Management System click here, to request a brochure click here.
Comments are closed.
Search Blog
Recent Posts
- BREEAM Excellent certified Conwy Culture Centre contributes to a green future with a new Alumasc roof
- A great support system for UEA’s new science building: Roof-Pro supports get full marks
- Whitechapel Station roof canopy transformed with Blackdown Greenroofs’ NatureMat®
- Creating Paradise: Alumasc delivers for the complete building envelope for One Chamberlain Square Paradise project
- Alumasc’s carbon dioxide neutralising roofing helps NTU stay one of UK’s most environmentally friendly universities
- Alumasc provides long lasting roofing solution for one of London's premier new addresses: The Whitehouse Apartments
- Roof-Pro Top of the Class at Tonyrefail School
- Blackdown Greenroofs provides exclusive roof gardens for the residents of The Old Vinyl Factory, West London.
- A carbon dioxide neutralising roof? Dundee University benefits from Olivine roofing from Alumasc Roofing Systems
- Sustainable drainage systems (SuDS) on Welsh new developments are now mandatory
Categories
- Apprenticeships
- Awards
- Blackdown
- Blue Roofs
- Budget Management
- Caltech Liquid Waterproofing
- Charity
- CPDs
- derbibrite
- Derbigum
- Eco Roofs
- Envelope Solution
- Euroroof
- Exhibitions & Events
- FAQs
- Flat Roof Membranes
- Government Frameworks
- Green Roofs
- Guardrail
- Hot Melt
- Hybrid Insulation
- Hydrotech
- LABC
- LHC
- Liquid Roofing
- Local Authority
- Maintenance
- Monoscreed
- New Build
- NFRC
- NHBC
- Passive House
- Product Lifespan
- Refurbishment
- Registered Contractors
- Roof Surveys
- Roof-Pro
- Roofing
- Roofing Industry Information
- Single Ply Roofing Membrane
- Single Source
- Single Source Solutions
- solar reflective
- Stormwater Management
- SuDS
- Sustainability
- The Team
- Uncategorised
- Uncategorized
- Waterproofing
- Work Experience
Archives
- March 2020
- February 2020
- December 2019
- October 2019
- August 2019
- May 2019
- April 2019
- March 2019
- February 2019
- October 2018
- September 2018
- August 2018
- July 2018
- June 2018
- May 2018
- April 2018
- March 2018
- February 2018
- January 2018
- November 2017
- October 2017
- September 2017
- August 2017
- July 2017
- June 2017
- May 2017
- April 2017
- March 2017
- February 2017
- December 2016
- November 2016
- October 2016
- August 2016
- July 2016
- May 2016
- April 2016
- February 2016
- January 2016
- December 2015
- November 2015
- October 2015
- September 2015
- August 2015
- July 2015
- June 2015
- May 2015
- April 2015
- March 2015
- February 2015
- January 2015
- December 2014
- November 2014
- October 2014
- September 2014
- August 2014
- July 2014
- June 2014
- May 2014
- April 2014
- March 2014
- January 2014
- December 2013
- November 2013
- October 2013
- September 2013
- August 2013
- July 2013
- April 2013
- March 2013
- January 2013
- December 2012
- November 2012
- October 2012
- July 2012
- May 2012
- March 2012
- February 2012
- December 2011
- September 2011
- July 2011
- May 2011
- March 2011
- January 2011
- November 2010
- September 2010
- August 2010
- July 2010
- May 2010
- April 2010
- March 2010
- February 2010